Implementing a quality control system that incorporates
good administrative records ensures all our work is detailed
and can be easily tracked and evaluated.
We record air temperature, surface temperature, humidity and dew point levels
for each application on all projects. We strictly adhere to the paint
manufacturer’s technical specifications, and record all product batch numbers
for traceability. It is this commitment to develop excellent method and report
systems that allows us to offer a fully insured third party guarantee on the
work we do.
In an industry where there is much debate about acceptable standards and lack
of regulation, it is good to see that in most yards more emphasis is being put
on properly integrating the fairing and painting process in new build
activities.
I believe the balancing act between project management and achieving excellent
results is about to get even tougher due to the ever increasing pressure on
delivery dates, but if applicators, surveyors and paint manufacturers can
continue to raise the standards of self regulation – there will be a bright
future.
Chris Atkinson, director, Acamarine
ACA Marine
14 rue Montcalm - 17000 La Rochelle - FRANCE
Tél + 33 (0)5 46 41 73 97 | Fax + 33 (0)5 46 43 91 51