Boat name: M/Y ALFA NERO
Vessel Type: Motor Yacht
Length: 82 meters
Refit Location: La Ciotat, France
Team size: Mobile team of 20
Project length: 6 months

Paintworks successfully completed on MY ALFA NERO in May 2013. Both hull & superstructures were repaired (corrosion work) and totally repainted in 6 months.

Awlgrip topcoat was applied on the superstructures. Jotun topcoat + clear coat was applied on the topsides.

Jotun antifouling was applied below the waterline.